Choa Chu Kang station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station, located in Choa Chu Kang near Lot One Shoppers' Mall, Choa Chu Kang Stadium and The Rainforest. There have been 102 disruptions and 15 maintenance operations.

Station Details

LineStation CodeOpenedClosed
NSLNorth-South Line
NS4
1990-03-10-
BPLRTBukit Panjang LRT
BP1
1999-11-06-
JRLJurong Region Line
JS1
2027-12-31-

Issues (117)

2025

Bukit Panjang LRT service disruption due to power fault

Power Fault
BPLRT
13 stations
2025-07-03T09:24:25.000+08:00/2025-07-03T11:30:25.000+08:00PT7560S

NSL Service Disruption Due to Signaling Fault

Signal Fault
NSL
12 stations
2025-06-13T09:28:37.000+08:00/2025-06-13T10:24:36.000+08:00PT3359S

North-South Line and East-West Line disruption

Train Fault
Delay
NSLEWL
57 stations
2025-02-07T05:52:23.000+08:00/2025-02-07T20:02:31.000+08:00PT51008S
2024

Bukit Panjang LRT services to end earlier

System Upgrade
BPLRT
13 stations
2024-11-14T22:30:00.000+08:00/2025-11-01T00:00:00.000+08:00
202x
PT1090800S

Service disruption on North-South Line due to traction power fault

Power Fault
NSL
5 stations
2024-06-03T18:08:50.000+08:00/2024-06-03T20:10:57.000+08:00PT7327S

No train service between Choa Chu Kang and South View due to a power fault

Power Fault
BPLRT
2 stations
2024-03-28T18:51:33.000+08:00/2024-03-28T19:28:23.000+08:00PT2210S
2023

Full closure of train services on Bukit Panjang LRT

System Upgrade
BPLRT
13 stations
2023-10-01T00:00:00.000+08:00/2023-10-02T00:00:00.000+08:00PT66600S

Early closure of train services on Bukit Panjang LRT

System Upgrade
BPLRT
13 stations
2023-08-12T22:30:00.000+08:00/2023-08-21T00:00:00.000+08:00
4x
PT21600S

Train service disruption due to fault on BPLRT

Train Fault
BPLRT
6 stations
2023-05-04T16:49:36.000+08:00/2023-05-04T17:36:40.000+08:00PT2824S

Trackside switch fault causing service disruption on Bukit Panjang LRT

Track Fault
BPLRT
13 stations
2023-04-25T18:54:03.000+08:00/2023-04-26T00:00:00.000+08:00PT18357S

Power fault causing shuttle service disruption

Power Fault
BPLRT
6 stations
2023-03-08T20:20:10.000+08:00/2023-03-08T20:42:24.000+08:00PT1334S

Track fault affecting North-South Line

Track Fault
NSL
9 stations
2023-02-06T05:50:55.000+08:00/2023-02-06T07:51:00.000+08:00PT7205S
2022

Track fault causing delays on Bukit Panjang LRT

Track Fault
Delay
BPLRT
6 stations
2022-10-13T14:28:39.000+08:00/2022-10-13T14:51:00.000+08:00PT1341S

Track Fault at Bukit Panjang LRT

Track Fault
BPLRT
13 stations
2022-09-21T18:14:32.000+08:00/2022-09-22T05:30:00.000+08:00PT20728S

Major train delay on North-South Line

Train Fault
Delay
NSL
6 stations
2022-07-08T17:56:24.000+08:00/2022-07-08T18:37:09.000+08:00PT2445S

Train service delay from Bukit Panjang to Choa Chu Kang

Train Fault
BPLRT
6 stations
2022-05-24T09:21:43.000+08:00/2022-05-24T09:46:05.000+08:00PT1462S

Train Fault on Bukit Panjang LRT

Train Fault
BPLRT
6 stations
2022-05-12T08:15:29.000+08:00/2022-05-12T08:34:34.000+08:00PT1145S

Track Signal Fault at Choa Chu Kang LRT Station

Signal Fault
BPLRT
9 stations
2022-01-08T17:45:08.000+08:00/2022-01-08T18:10:39.000+08:00PT1531S
2021

Train fault affecting North-South Line

Train Fault
Delay
NSL
5 stations
2021-12-24T16:02:55.000+08:00/2021-12-24T16:29:16.000+08:00PT1581S

Train Fault at Bukit Panjang LRT

Train Fault
Power Fault
BPLRT
13 stations
2021-12-09T06:22:12.000+08:00/2021-12-09T09:49:14.000+08:00PT12422S

Power fault causing slower train movements towards Choa Chu Kang on Service B

Power Fault
BPLRT
6 stations
2021-10-03T07:08:58.000+08:00/2021-10-03T09:19:19.000+08:00PT7821S

Train fault causing delays towards Bukit Panjang on Service A

Train Fault
BPLRT
13 stations
2021-06-27T07:40:26.000+08:00/2021-06-27T10:20:01.000+08:00PT9575S

Train fault causing delays

Train Fault
Delay
NSL
8 stations
2021-01-08T23:02:40.000+08:00/2021-01-09T00:01:43.000+08:00PT3440S
2020

Service disruption due to power fault

Power Fault
NSL
7 stations
2020-10-14T19:55:51.000+08:00/2020-10-14T22:53:32.000+08:00PT10661S
2019

Major Outage on North-South Line

Signal Fault
NSL
4 stations
2019-12-16T08:14:52.000+08:00/2019-12-16T08:49:45.000+08:00PT2093S

Power fault affecting Bukit Panjang LRT service

Power Fault
BPLRT
13 stations
2019-07-06T11:08:31.000+08:00/2019-07-06T11:37:30.000+08:00PT1739S

Train service disruption between Choa Chu Kang and Bukit Panjang stations

Train Fault
BPLRT
6 stations
2019-04-02T10:05:38.000+08:00/2019-04-02T10:46:40.000+08:00PT2462S

Service Disruption due to Power Fault on BPLRT

Power Fault
BPLRT
6 stations
2019-03-24T08:58:18.000+08:00/2019-03-24T09:13:58.000+08:00PT940S

Service disruption on North-South Line due to train fault

Train Fault
NSL
8 stations
2019-03-04T10:58:49.000+08:00/2019-03-04T11:23:07.000+08:00PT1458S
2018

Train services suspended due to power fault

Power Fault
BPLRT
14 stations
2018-12-09T20:44:04.000+08:00/2018-12-09T21:02:46.000+08:00PT1122S

No service on Bukit Panjang LRT due to power fault

Power Fault
BPLRT
14 stations
2018-11-07T23:56:28.000+08:00/2018-11-08T05:15:02.000+08:00PT212S

Service Disruption on Bukit Panjang LRT Due to Power Fault

Power Fault
BPLRT
14 stations
2018-06-23T05:43:41.000+08:00/2018-06-23T06:40:53.000+08:00PT3432S

Service disruption on Bukit Panjang LRT

Train Fault
BPLRT
14 stations
2018-05-19T14:17:34.000+08:00/2018-05-19T15:52:07.000+08:00PT5673S

Service disruption on Bukit Panjang LRT

Train Fault
BPLRT
5 stations
2018-01-18T16:12:02.000+08:00/2018-01-18T16:54:50.000+08:00PT2568S

No Train Service on BPLRT Due to Track Fault

Track Fault
BPLRT
14 stations
2018-01-12T14:35:43.000+08:00/2018-01-12T18:30:42.000+08:00PT14099S
2017

Signalling Fault at Yew Tee Station

Signal Fault
NSL
5 stations
2017-12-25T22:43:22.000+08:00/2017-12-25T23:22:39.000+08:00PT2357S

Major disruption on the North-South Line

NSL
26 stations
2017-11-15T17:05:07.000+08:00/2017-11-15T22:18:03.000+08:00PT18776S

Bukit Panjang LRT adjusted start time for track maintenance

Track Work
BPLRT
14 stations
2017-11-12T05:30:00.000+08:00/2017-12-31T07:00:00.000+08:00
8x
PT43200S

Signalling system fault causing delays

Signal Fault
Train Fault
Delay
NSL
4 stations
2017-10-04T18:01:03.000+08:00/2017-10-04T18:24:27.000+08:00PT1404S

No train service due to train fault

Train Fault
BPLRT
14 stations
2017-09-09T11:12:18.000+08:00/2017-09-09T16:25:08.000+08:00PT18770S

Major train fault on North-South Line causing delays

Train Fault
Delay
NSL
11 stations
2017-08-31T18:19:33.000+08:00/2017-08-31T18:55:24.000+08:00PT2151S

Track point fault on North-South Line, only one platform operational at Jurong East

Track Fault
NSL
5 stations
2017-08-23T17:09:26.000+08:00/2017-08-24T00:00:00.000+08:00PT24634S

Major track fault causing delays on North-South Line

Track Fault
NSL
5 stations
2017-08-23T07:32:31.000+08:00/2017-08-23T08:53:29.000+08:00PT4858S

Train fault causing Service B suspension

Train Fault
BPLRT
14 stations
2017-08-12T14:07:58.000+08:00/2017-08-12T14:56:51.000+08:00PT2933S

Intermittent power fault on NSEWL

Power Fault
Delay
NSLEWL
58 stations
2017-07-25T07:26:15.000+08:00/2017-07-25T11:06:00.000+08:00PT13185S

No train service between Choa Chu Kang and Bukit Panjang due to a train fault

Train Fault
BPLRT
6 stations
2017-07-20T13:45:38.000+08:00/2017-07-20T14:03:42.000+08:00PT1084S

No train service on NSL between Jurong East and Kranji, Queenstown and Tuas Link

Power Fault
NSLEWL
20 stations
2017-07-13T00:02:45.000+08:00/2017-07-13T01:20:02.000+08:00PT0S

Service disruption on North-South Line

Train Fault
NSL
8 stations
2017-07-07T08:31:54.000+08:00/2017-07-07T09:13:48.000+08:00PT2514S

Train service disruption on the North-South Line due to signalling fault

Signal Fault
NSL
26 stations
2017-06-28T17:15:21.000+08:00/2017-06-28T19:17:02.000+08:00PT7301S

Signalling system fault causing delays

Signal Fault
Delay
NSL
4 stations
2017-06-12T09:10:38.000+08:00/2017-06-12T09:47:24.000+08:00PT2206S

North-South Line Travel Time Extension Due to Signalling System Checks

Delay
NSL
26 stations
2017-06-01T18:47:52.000+08:00/2017-06-01T19:41:23.000+08:00PT3211S

Train Signalling Fault on North-South Line

Signal Fault
NSL
4 stations
2017-05-29T18:04:01.000+08:00/2017-05-29T18:19:24.000+08:00PT923S

Trial of New Signalling System on North-South Line

System Upgrade
NSL
26 stations
2017-04-12T23:00:00.000+08:00/2017-04-12T23:10:00.000+08:00PT600S

Trial of New Signalling System on North-South Line

System Upgrade
NSL
26 stations
2017-04-11T23:00:00.000+08:00/2017-04-11T23:10:00.000+08:00PT600S

North-South Line trial of new signalling system

System Upgrade
NSL
26 stations
2017-04-10T23:00:00.000+08:00/2017-04-10T23:10:00.000+08:00PT600S

North-South Line trains stationary for signalling system trial

System Upgrade
NSL
26 stations
2017-04-06T23:00:00.000+08:00/2017-04-06T23:10:00.000+08:00PT600S

Planned trial of new signalling system on NSL

System Upgrade
NSL
26 stations
2017-04-05T23:00:00.000+08:00/2017-04-05T23:10:00.000+08:00PT600S

North-South Line trains stationary for signalling trial

System Upgrade
NSL
26 stations
2017-04-04T23:00:00.000+08:00/2017-04-04T23:10:00.000+08:00PT600S

North-South Line trains stationary for new signalling trial

System Upgrade
NSL
26 stations
2017-04-03T23:00:00.000+08:00/2017-04-03T23:10:00.000+08:00PT600S

Train fault causing delays on North-South Line

Train Fault
Delay
NSL
4 stations
2017-03-31T07:12:22.000+08:00/2017-03-31T07:25:50.000+08:00PT808S

No train service between BP1 and BP6 on the Bukit Panjang LRT

BPLRT
6 stations
2017-03-28T20:57:45.000+08:00/2017-03-28T21:28:47.000+08:00PT1862S

Train fault causing delay on North-South Line

Train Fault
Delay
NSL
14 stations
2017-02-13T07:58:50.000+08:00/2017-02-13T08:26:57.000+08:00PT1687S

Train services on BPLRT affected due to a train fault

Train Fault
BPLRT
14 stations
2017-02-10T15:26:16.000+08:00/2017-02-10T15:43:42.000+08:00PT1046S
2016

Service disruption due to train fault between Bukit Panjang & Phoenix

Train Fault
BPLRT
14 stations
2016-10-26T17:51:06.000+08:00/2016-10-26T19:12:48.000+08:00PT4902S

No train service between Choa Chu Kang and Bukit Panjang

Power Fault
BPLRT
6 stations
2016-09-28T10:56:58.000+08:00/2016-09-28T18:17:15.000+08:00PT26417S

No train service on Bukit Panjang LRT

Power Fault
BPLRT
14 stations
2016-09-28T05:33:00.000+08:00/2016-09-28T09:52:26.000+08:00PT15566S

No train service between Choa Chu Kang and Bukit Panjang

Power Fault
BPLRT
6 stations
2016-09-27T22:55:25.000+08:00/2016-09-28T00:27:39.000+08:00PT3875S

No train service from Yew Tee to Bukit Gombak due to track fault

Track Fault
NSL
8 stations
2016-08-30T06:08:57.000+08:00/2016-08-30T06:15:00.000+08:00PT363S

No LRT service on BPLRT

BPLRT
14 stations
2016-04-25T21:45:38.000+08:00/2016-04-25T21:52:37.000+08:00PT419S

Service Disruption: No train service between Joo Koon and Bugis, Woodlands and Jurong East

Power Fault
NSLEWL
25 stations
2016-04-25T20:11:58.000+08:00/2016-04-25T20:34:18.000+08:00PT1340S

No train service on BPLRT due to traction power fault

Power Fault
BPLRT
14 stations
2016-02-26T05:25:38.000+08:00/2016-02-26T06:24:16.000+08:00PT3256S

Major service disruption on Bukit Panjang LRT

BPLRT
14 stations
2016-01-22T05:54:44.000+08:00/2016-01-22T10:43:29.000+08:00PT17325S
2015

Train fault causing longer travelling times on NS line

Train Fault
NSL
26 stations
2015-10-27T18:14:17.000+08:00/2015-10-27T18:22:19.000+08:00PT482S

Faulty train causing major service delays

Train Fault
Delay
NSL
26 stations
2015-09-22T08:40:39.000+08:00/2015-09-22T08:48:15.000+08:00PT456S

Trains on the NSEW line running at degraded mode

NSLEWL
54 stations
2015-07-08T05:21:19.000+08:00/2015-07-08T23:59:59.000+08:00PT66599S

Traction power fault causing delays

Power Fault
Delay
NSLEWL
53 stations
2015-07-07T19:16:12.000+08:00/2015-07-07T22:35:58.000+08:00PT11986S

Track Fault on North-South Line

Track Fault
NSL
6 stations
2015-07-03T09:19:12.000+08:00/2015-07-03T09:25:58.000+08:00PT406S

Power fault affecting Bukit Panjang LRT services

Power Fault
BPLRT
14 stations
2015-04-28T19:32:50.000+08:00/2015-04-28T20:35:59.000+08:00PT3789S

Major track fault causing delays on North-South Line

Track Fault
NSL
11 stations
2015-04-15T08:50:11.000+08:00/2015-04-15T09:15:57.000+08:00PT1546S

Additional waiting time on North-South Line

NSL
26 stations
2015-04-10T06:36:40.000+08:00/2015-04-10T06:51:02.000+08:00PT862S

Additional Travel Time on Bukit Panjang LRT

Train Fault
BPLRT
14 stations
2015-03-30T19:20:39.000+08:00/2015-03-30T20:15:56.000+08:00PT3317S

Track Fault Causes Delays on North-South Line

Track Fault
Delay
NSL
3 stations
2015-03-18T14:37:25.000+08:00/2015-03-18T15:21:46.000+08:00PT2661S

Track inspection completed

Track Work
NSL
6 stations
2015-03-13T16:29:10.000+08:00/2015-03-13T16:33:09.000+08:00PT239S

Service disruption on Bukit Panjang LRT

Power Fault
BPLRT
14 stations
2015-03-08T21:49:33.000+08:00/2015-03-10T08:07:01.000+08:00PT83848S

Track intrusion causing delays on North-South Line

Security
NSL
5 stations
2015-02-27T21:05:28.000+08:00/2015-02-27T21:32:05.000+08:00PT1597S

No train service between Choa Chu Kang & Keat Hong

BPLRT
13 stations
2015-02-24T12:18:25.000+08:00/2015-02-24T13:35:20.000+08:00PT4615S
2014

Train Fault on North-South Line

Train Fault
NSL
5 stations
2014-03-28T07:32:48.000+08:00/2014-03-28T08:01:00.000+08:00PT1692S

Major Track Fault on North-South Line

Track Fault
NSL
11 stations
2014-02-24T07:02:20.000+08:00/2014-02-24T09:00:15.000+08:00PT7075S
2013

BPLRT train service disruption

Track Fault
BPLRT
14 stations
2013-07-04T05:36:42.000+08:00/2013-07-04T06:56:09.000+08:00PT4767S

Incident on Bukit Panjang LRT

BPLRT
14 stations
2013-05-31T20:51:25.000+08:00/2013-05-31T22:04:22.000+08:00PT4377S

Train fault causing delays between Bukit Panjang and Choa Chu Kang

Train Fault
Delay
BPLRT
6 stations
2013-05-17T10:42:47.000+08:00/2013-05-17T10:51:37.000+08:00PT530S

No service at all BPLRT stations due to suspected power fault

Power Fault
BPLRT
14 stations
2013-04-02T12:16:51.000+08:00/2013-04-02T12:56:17.000+08:00PT2366S
2012

Train Fault on North-South Line

Train Fault
NSL
24 stations
2012-12-31T12:21:55.000+08:00/2012-12-31T12:47:52.000+08:00PT1557S

Train Fault on North-South Line

Train Fault
NSL
8 stations
2012-10-28T07:02:52.000+08:00/2012-10-28T07:18:24.000+08:00PT932S

Service disruption on North-South Line due to track fault

Track Fault
Delay
NSL
25 stations
2012-10-24T18:31:45.000+08:00/2012-10-24T19:24:05.000+08:00PT3140S

Service disruption on North-South Line

Delay
NSL
6 stations
2012-08-23T08:11:24.000+08:00/2012-08-23T08:33:47.000+08:00PT1343S

Train fault causing delays on southbound line

Train Fault
NSL
3 stations
2012-07-25T12:49:35.000+08:00/2012-07-25T12:53:14.000+08:00PT219S

Northbound Train Speeds Reduced

Delay
NSL
25 stations
2012-07-05T18:56:12.000+08:00/2012-07-05T19:19:24.000+08:00PT1392S

Northbound train service disruption from Ang Mo Kio

Delay
NSL
14 stations
2012-06-12T18:47:19.000+08:00/2012-06-12T18:53:01.000+08:00PT342S

Train fault causing delays from Yew Tee to Jurong East

Train Fault
Delay
NSL
5 stations
2012-05-30T08:25:42.000+08:00/2012-05-30T08:51:55.000+08:00PT1573S

Northbound train service slower due to train fault

Train Fault
NSL
25 stations
2012-05-21T08:09:46.000+08:00/2012-05-21T08:32:40.000+08:00PT1374S

South-bound train service moving slowly

Track Fault
NSL
25 stations
2012-04-24T21:28:27.000+08:00/2012-04-24T22:07:24.000+08:00PT2337S

BPLRT service disruption

Delay
BPLRT
13 stations
2012-04-22T17:32:58.000+08:00/2012-04-22T19:33:07.000+08:00PT7209S

North-bound train service toward Orchard moving slower due to track fault

Track Fault
NSL
25 stations
2012-04-19T19:54:27.000+08:00/2012-04-19T22:44:10.000+08:00PT10183S

South-bound train service disrupted due to track fault

Track Fault
NSL
25 stations
2012-04-03T08:42:46.000+08:00/2012-04-03T10:03:17.000+08:00PT4831S

South-bound train service from Bukit Gombak to Woodlands disrupted

Delay
NSL
6 stations
2012-03-12T09:36:33.000+08:00/2012-03-12T09:51:46.000+08:00PT913S

Delays on South-bound Train Services

Train Fault
NSLEWL
51 stations
2012-02-14T08:30:13.000+08:00/2012-02-15T00:00:00.000+08:00PT55787S

Train service delay on North-South Line

Train Fault
NSL
25 stations
2012-02-08T07:25:27.000+08:00/2012-02-08T07:48:45.000+08:00PT1398S
2011

North bound train service is slow due to speed restrictions

Delay
NSL
25 stations
2011-12-29T08:53:51.000+08:00/2011-12-29T12:50:31.000+08:00PT14200S

Train services running slower due to speed restrictions

Delay
NSL
15 stations
2011-12-27T09:14:55.000+08:00/2011-12-27T19:33:58.000+08:00PT37143S

Trains running slower due to speed restrictions

Delay
NSLEWL
53 stations
2011-12-26T10:48:38.000+08:00/2011-12-27T00:00:00.000+08:00PT47482S

Train services running slower due to wet weather

Weather
Delay
NSLEWL
53 stations
2011-12-25T09:12:29.000+08:00/2011-12-26T00:00:00.000+08:00PT53251S

Delay due to wet weather affecting train speed

Delay
EWLNSLCCLBPLRT
89 stations
2011-12-23T14:49:58.000+08:00/2011-12-24T00:00:00.000+08:00PT33002S

Train service disruption due to track fault

Track Fault
NSL
11 stations
2011-12-22T09:01:42.000+08:00/2011-12-23T00:00:00.000+08:00PT53898S

Train service disruption due to wet tracks

Weather
Delay
EWLNSL
53 stations
2011-12-20T08:37:29.000+08:00/2011-12-21T00:00:00.000+08:00PT55351S

Trains travelling at slower speed due to wet tracks

Weather
Delay
NSLEWL
53 stations
2011-12-19T11:40:23.000+08:00/2011-12-20T00:00:00.000+08:00PT44377S

Delayed service on North-South Line and East-West Line

NSLEWL
53 stations
2011-12-18T05:30:00.000+08:00/2011-12-18T12:25:36.000+08:00PT24936S